Data Centres

LON 3

Construction of a new hyperscale Data Centre on the Slough Trading Estate

We initially reviewed the landlord’s base building and proposed alterations to the base build to suit the client’s requirements prior to construction. We have then developed through RIBA Stages 1-4 for the fit out of the Data Centre.

TPA will carry out full Architectural services on the project which will be handed over in phases during 2025 to 2026.

The design has been developed in collaboration with MEP and C&S engineers, for a fully coordinated BIM model. This process will be developed through all of the stages to a comprehensive as-built model.

The Data Centre building comprises of 3 floors with 2 halls per floor, and a top floor of plant rooms and open chiller deck. An external gantry has been placed on the side of the main building, with ground and first floor MEP pods, and second floor with generators. An elevated office building is located along the northern elevation, providing 2 floors of office spaces and a top level for plant.

This project demonstrates the ability to fit high density IT on a limited site and footprint.

LON 3 Main Image