Data Centres
Sberbank Mega
The existing concrete framed building was transformed into 5000 sqm of IT space, becoming the largest Sberbank Data Centre. Careful planning was necessary to accommodate power supplies, with appropriate levels of redundancy, and to achieve the client’s energy efficiency requirement for an annual PUE under 1.6.
The proposed indirect free cooling concept is for the internal data hall air (primary) to be passed through one side of a large heat recovery device and rejecting heat to the external air (secondary) side, through which outside air is passed. At all times, the two air streams are separated by the plates within the heat exchanger. During extreme external ambient conditions neither the free cooling or evaporative cooling (alone or combined) are able to meet the primary air supply conditions. Therefore, supplementary cooling is required from the incorporation of chilled water or DX cooling coils.
To enable additional resilience of operation, the fans in each of the units are installed on an N+1 basis. This can produce a mechanical PUE of under 0.10.